Italiano English - Under Construction Russian - Under Construction
M&S Pool

НОВОСТИ

07/01/2015

MODULAR SLITTEING LINE "Patent"

NEW MODULAR SLITTER (Patented) 1. Absolutely no works of foundations (obviously excluding the loop... следует]

08/11/2014

LDM in METALEXPO 2014 - MOSCA

LDM in METALEXPO 2014 - MOSCA... следует]

01/07/2014

La HASCON FILTRATION da oggi è nel nostro TEAM

Hascon FiltrationS.r.l. work, with thirty years of experience, in the field of air dedusting and ... следует]

АРХИВ

Показать все новости...

ВЫСТАВКИ

10/11/2014

EUROBLECH 2014

EuroBlech 2014... следует]

26/05/2014

M&S POOL alla EUROBLECH (HALL 16 - STAND A12)

Il Team M&S POOL sarà, anche in questa Edizione, presente alla EuroBlech. Lo Stand di ... следует]

14/04/2014

SAG e CONTE alla TUBE di Dusseldorf

SAG and Conte MM in the Tube 2014 - Düsseldorf ... следует]

АРХИВ

Показать все выставки...

О НАС ГОВОРЯТ В ПРЕССЕ

05/12/2011

IL GIORNALE DI LECCO

Il Giornale di Lecco parla della nostra presenza al MATCHING 2011.... следует]

09/11/2011

IL TEAM M&S PRESENTE SULLE RIVISTE RUSSE

Una delegazione Russa ha visitato la LDM e la SCOLARI L'entusiasmo per questa Open House ha avuto ... следует]

09/11/2011

IN RUSSIA SI PARLA DI O.M.SA

Importante rivista Russa parla di O.M.SA. La validità dell'ultimo impianto di verniciatura ... следует]

АРХИВ

Показать все содержание...

ОБОРУДОВАНИЕ Б/У КОМПАНИИ "М&С ПУЛ"

АРХИВ

Показать оборудование б/у

НОВОСТИ

MODULAR SLITTEING LINE "Patent" [07/01/2015]

NEW MODULAR SLITTER (Patented) 1. Absolutely no works of foundations (obviously excluding the loop) and this, for the purchaser, is a considerable SAVING (economic and logistics) 2. ONE WEEK for installation and commissioning and this, for the purchaser, is a considerable SAVING (economical and logistics) 3. Delivery in 2-3 months and this, for the purchaser (added to the very small time for installation and commissioning), is an immediate PRODUCTIVITY. 4. Easy future INTEGRATION of machines (not purchased at the beginning) ; you can buy the “basic” slitter prepared for easy future additions. 5. The integrations future (of machines in the "base" line) happen in 1 or 2 days, and especially WITHOUT ”change” the foundations and machines. 6. The extreme MODULARITY of the Slitter, ensures a simple and quick displacement of the line and also (if necessary in future), change of the march direction line, WITHOUT CHANGING machines etc. 7. The modularity ensures spare parts